Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder

Product Details
Customization: Available
After-sales Service: 1 Year
Type: Cooling Equipment
Manufacturer/Factory & Trading Company
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 10 R&D engineers, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (33)
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
  • Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
Find Similar Products
  • Overview
  • Product Parameters
  • SCOPE OF APPLICATION
  • Product Details
  • More Details
  • Field Installation
  • FAQ
Overview

Basic Info.

Model NO.
SKLN
Processing Object
Feed Granular
Processing Technics
Cooler
Screen Mesh
Without Screen Mesh
Grinding Equipment Type
Cooler
Pellet Mill Type
Pressing Granulator
Bulking Machine Type
No
Expanding Method
No
Condition
New
Applicable Materials Shape
Granular
Warranty
1 Year
Advantage
High Efficient Cooling
Feature
Pellet Cooling
Key Selling Points
Long Service Life
Voltage
Clients′ Local Voltage
Transport Package
Steel Iron Box
Specification
Customized
Trademark
YUDA
Origin
China
HS Code
84368000
Production Capacity
100piece/Year

Product Description

Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
Product Parameters
Model Power (KW) Capacity (T/H) Volum (m³) Weight (KG)
SKLN1.5 1.5 3 1.5 980
SKLN2.5 1.5 5 2.5 1170
SKLN4 2.2 10 4 1740
SKLN5 3 12 5 1800
SKLN6 3 15 6 2004
SKLN8 3 20 8 2280
SKLN10 3 25 10 3000
SKLN12 3 30 12 3600
SCOPE OF APPLICATION

Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder

Product Details

Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder

More Details

Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
Field Installation

Yuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air FeederYuda Slkn Series 3t/H Cooler with Stainless Steel Top - Cap & Split Air Feeder
FAQ

1. Will you help with installation and stuff training ? 
Of course, we can send our skilled engineers to provide you entire service from the installation,commissioning and training. 

2. How do you control the quality? 
We insist "Quality is life" and always pay great attention to quality control from the beginning to the end. You can also be reassured by our one-year warranty and CE&BV&SGS Certificates. 

3. Can you provide turn-key project? 
Yes, we have enough experience in installing turn-key projects overseas. 

4.Where is your factory located? How can I visit there? 
Our factory is located in Liyang City, Jiangsu Province, China, near Shanghai. You can fly to Shanghai airport or Nanjing Airport directly. All our clients, from home or abroad, are warmly welcome to visit us. 

5. When can I get the price? 
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

6.Do you offer local repair services, or will a technician be dispatched from your headquarters?
Trained workers can carry out routine maintenance, and special cases can be video-guided
by headquarters

7.What are your payment terms (e.g., deposit percentage, installment options, final payment timeline)?
T/T, 30% before signing the contract; 65% before shipment. 5% of the balance, paid within 30 days after installation and commissioning.Advance payment ratio is negotiable.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier