Product Description
SSLG Series Roll Crusher:
1.International advanced type, three roller structure;
2.Broken product more uniform, uniform feeding roller separate frequency conversion control, feed evenly;
3.Roller diameter is big, the effect is better, and the capacity is big.
4.A special design of sampling hole can be adjusted timely to observe. Uniform is convenient, fast, reliable.
5.strong adaptability, applicable ornamental fish shrimp bait and various seedlings shrimp.
Product Parameters
Model |
Power (kw) |
Capacity (t/h) |
Slow roller speed (rpm) |
Fast roller speed(rpm) |
Weight (kg) |
SSLG25×100×3 |
7.5+1.1 |
6-8 |
360 |
470 |
900 |
SSLG25×140×3 |
11+1.1 |
8-15 |
360 |
470 |
1660 |
SSLG25×170×3 |
18.5+1.1 |
15-20 |
360 |
470 |
1770 |
SSLG30×180×3 |
22+2.2 |
20-25 |
315 |
470 |
2100 |
Detailed Photos

Field Installation

Certifications

Our Advantages

Company Profile

FAQ
1. Will you help with installation and stuff training ?
Of course, we can send our skilled engineers to provide you entire service from the installation,commissioning and training.
2. How do you control the quality?
We insist "Quality is life" and always pay great attention to quality control from the beginning to the end. You can also be reassured by our one-year warranty and CE&BV&SGS Certificates.
3. Can you provide turn-key project?
Yes, we have enough experience in installing turn-key projects overseas.
4.Where is your factory located? How can I visit there?
Our factory is located in Liyang City, Jiangsu Province, China, near Shanghai. You can fly to Shanghai airport or Nanjing Airport directly. All our clients, from home or abroad, are warmly welcome to visit us.
5. When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
6.Do you offer local repair services, or will a technician be dispatched from your headquarters?
Trained workers can carry out routine maintenance, and special cases can be video-guided by headquarters
7.What are your payment terms (e.g., deposit percentage, installment options, final payment timeline)?
T/T, 30% before signing the contract; 65% before shipment. 5% of the balance, paid within 30 days after installation and commissioning.Advance payment ratio is negotiable.